Mad River Slough Crossing
The pipelines and support structure over the Mad River Slough were constructed in 1966. These two essential water lines are part of the regional water transmission system. They supply water for public health and fire-fighting to residents and businesses on the Samoa Peninsula and the Humboldt Community Services District.